The exterior walls, insulation, and electrical wiring are already in place at the new house. A lot of progress has been made since we last saw it in April after we came back from the East Coast. This coming week, the drywalls will be going in.
The insulation is all in, now when we talk inside the house it doesn’t echo anymore. It also feels cooler! This is the study…
Drywall on the floor is ready to put in this coming week…
Insulation in the upstairs loft…
Insulation in the 3rd guest room…
View of master bedroom from the 2nd guest bedroom…
Looking into the master bath (bathtub in the center of pohto) and 2 walk-in closets on each side…
Looking into the master bedroom and 2 walk-in closets from the master bathroom…
Ceiling insulation with recessed lighting in the great (living) room…
Double electrical outlets…
Electrical outlets on the extended kitchen counter…
Recessed lighting and 2 pendant lights over the extended kitchen island!
The air ducts with recessed lighting in the ceiling…
The hot and cold water switch of the shower in the master bathroom…
Air duct for the kitchen hood. The pantry is behind this wall…
Drywalls are in inside the garage…