Porch Awning + Fire Sprinkler System Are Installed

The porch awning and the CPVC fire sprinkler system inside the house are installed.  It’s been 20 days since we last checked on the house.  We can see the awning here in this photo…

Porch awning

Our neighbors’ houses next to us on both sides are progressing nicely as well.  It’s fun to see all the houses being built in the same time frame.

Porch awning

Here is a closer look at the porch awning from the loft on the 2nd floor (photo on right)!  Once they put up that wall, we won’t be able to see it anymore.

Front door and porch awning

These are the fire sprinklers!  They are installed throughout the house in the ceiling both on the main floor and the 2nd floor…

Sprinkler system inside the house

Sprinklers in the ceiling

I was checking out the space in my future office/study on the main floor!  Need to get my desk, bookshelves, filing cabinets made but won’t know the dimensions until we have drywall so I can take the measurements.

Hard hat inspection

The CPVC fire sprinkler system is low maintenance and has a 50-year life expectancy over the traditional metallic system.

Sprinklers in ceiling

Sprinklers in ceiling

Sprinklers in ceiling

The materials inside these black plastic bags are for the HVAC and the rough system which will be going up next.  Yippppeeee… so exciting!

Window screens in garage

Porch awning

CATEGORY: Construction Process

evonne

Related items

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!